Terrazzo is an application in which architects, who are used in more vivid colors compared to the floor applications used in the past, reflect their designs on the floor. It is an advantageous application compared to other floor covering materials with its long life and low maintenance cost.
There are some points that should be taken before starting the terrazzo application. For a terrazzo floor covering application that creates good results, it is necessary to review the controls that must be provided first.
Things to consider in terrazzo application?
A point that should not be overlooked in the resinous flooring processes that will be applied on concrete floors first is knowing the humidity, movement of moisture and air temperature in the building to be built, and it is a step that should be looked at before starting the work. In order for the floor folding process to be done successfully, the floor temperature should be 13-15 C degrees. In addition, the concentration point of the epoxy is another point to be considered. It is recommended that the surface temperature be above 5 °C by calculating the dew point.
Recommended article, carpet flooring types click here to get detailed information about it.
The temperature of the concrete floors should not be lower than the condensation point and the necessary controls should be made and then terrazzo floor coating should be applied. In the opposite case, the desired adhesion is not fully realized and the floor has a dull appearance. In order to avoid such situations, the application should be processed by providing suitable conditions for the floor covering process.
You can minimize such problems when the area where the terrazzo will be applied is ventilated with continuous air circulation.
Ground preparation in terrazzo application
It is important that you do your ground preparation correctly. Terrazzo flooring, which seems like a simple process, brings with it a difficult and expensive repair process if it is not applied to the appropriate floor. Therefore, the condition of the floor also determines the most suitable type of surface cleaning.
If terrazzo coating is to be applied on an old concrete floor, first of all the cracks must be repaired and all paint, adhesive and insulation materials on the surface must be cleaned. This cleaning ensures that the terrazzo application to be made on the old concrete gives good structural results.
For terrazzo coatings that have never been made on a concrete floor before, the floor should be maintained and the concrete should be waited for 28 days before proceeding. Before coating, materials such as adhesives should not be used on the concrete surface and the surface should be smoothed with a trowel.